Feasibility study for longwall mining solution with a shearer loader in the Narva open-cast mine of the 8th trench

Tagasi hanke otsingusse

Hanke detailid

Kirjeldus:

The aim of the procurement is to conclude a contract of mine design project for underground mining in the Narva open-cast mine according to procurement source documents.

Tarnija:

Pakkumise lõpp:

07.02.2020

Avaldamise kuupäev:

08.01.2020

Väärtus:

Blur

Dokumendid:

Blur
Blur
Blur

Lisainfo:

Blur

Sarnased hanked